Resource Leveling of an Industrial Building Using Genetic Algorithm Technique

DSpace Repository

Show simple item record

dc.contributor.author Atilla Damci; Istanbul Technical University
dc.contributor.author Gul Polat; Istanbul Technical University
dc.contributor.author Tuba Baysal
dc.date 2013-06-07 04:42:36
dc.date.accessioned 2013-07-15T11:43:00Z
dc.date.accessioned 2015-11-23T16:04:24Z
dc.date.available 2013-07-15T11:43:00Z
dc.date.available 2015-11-23T16:04:24Z
dc.date.issued 2013-07-15
dc.identifier http://ecs.epoka.edu.al/index.php/bccce/bccce2011/paper/view/287
dc.identifier.uri http://dspace.epoka.edu.al/handle/1/497
dc.description.abstract Construction companies should schedule their projects in a manner that considers theefficient use of limited resources in order to complete a project within estimated budget, onschedule and in compliance with the specifications. In this context, the planning of resourcesbecomes crucial for a construction project, which can be accomplished by resource leveling.Resource leveling - also known as resource smoothing - is a method that attempts to reducethe fluctuations in resource usage in order to make the resource requirements as uniform aspossible while maintaining the original project duration. The studies dealing with resource leveling problems can be classified into two categories, which are; (1) analytical methods and(2) heuristic methods. Analytical methods may give optimal solutions on small-scaledproblems; however, they are inadequate in large-scaled problems. As a result of theweaknesses of analytical methods, many studies have been conducted in order to developmore efficient models by heuristic methods. Genetic algorithm-based resource leveling is oneof these models, which is developed to attain better solutions. The main objective of thisstudy is to handle the resource leveling problem of an industrial building using geneticalgorithms. In this context, a schedule for an industrial building is established using theCritical Path Method (CPM). The information about the logical constraints and the resourcesrequired to carry out activities were obtained through the interviews with civil engineers fromthe company, whose expertise is on industrial buildings. The proposed genetic algorithmbased resource leveling model attempts to improve the schedule. The developed modelprovided a decrease of 20% in the total resource-days required to complete the project. Thestudy is of benefit to participants of construction industry, because it makes them aware of the potential use of the combination of critical path method and genetic algorithms in order to solve the resource leveling problem.
dc.format application/pdf
dc.language en
dc.publisher International Balkans Conference on Challenges of Civil Engineering
dc.rights Authors who submit to this conference agree to the following terms:<br /> <strong>a)</strong> Authors retain copyright over their work, while allowing the conference to place this unpublished work under a <a href="http://creativecommons.org/licenses/by/3.0/">Creative Commons Attribution License</a>, which allows others to freely access, use, and share the work, with an acknowledgement of the work's authorship and its initial presentation at this conference.<br /> <strong>b)</strong> Authors are able to waive the terms of the CC license and enter into separate, additional contractual arrangements for the non-exclusive distribution and subsequent publication of this work (e.g., publish a revised version in a journal, post it to an institutional repository or publish it in a book), with an acknowledgement of its initial presentation at this conference.<br /> <strong>c)</strong> In addition, authors are encouraged to post and share their work online (e.g., in institutional repositories or on their website) at any point before and after the conference.
dc.source International Balkans Conference on Challenges of Civil Engineering; 1st International Balkans Conference on Challenges of Civil Engineering
dc.title Resource Leveling of an Industrial Building Using Genetic Algorithm Technique
dc.type Peer-reviewed Paper


Files in this item

This item appears in the following Collection(s)

  • BCCCE 2011
    1st International Balkans Conference on Challenges of Civil Engineering

Show simple item record

Search DSpace


Browse

My Account